Milk Chilling Center

  • Electrial

  • Power in KVA

  • UG Cable Metering point to MV penal with earthing

  • Earth wire,GI Flat,

  • Stay wire

  • Earthing Pipe with materials

  • MV penal ,Change over penal, Lighting DB.

  • Stabilizer ( If necessary)

  • MVP to Stabilizer cable with earthing

  • To MVP to DB penal Cable

  • DB Box or Penal with accessories

  • To Load Cables and wires

  • Mcb\'s,wire,Switchs,SS command,pipes,clamps,Nail,Plug woods.

  • Light,Fan,Heater,water Pump,Insulation Tape,Tag,.

  • Diesel Generator

  • 30% of Diesel

  • Earth accessories,Pipes,Cups,Cu.wire,Coal,Solt,Bolt& Nuts

  • UG Cable for DG to MV penal

  • Water Supply

  • Water Source (Open or Bore Well)

  • Pump,Cable,Water Hose, Tag or clamp,

  • Water civil Tank or PVC Tank

  • Pvc Pipe line,valves,tee,L bow,clamps, Plug wood ,Nails

  • Water Rubber hose and accessories

  • waste water collection Tank

  • Pump,cable,Pvc Line,clamp,

  • Irrigation Land for water Disposal purpose.

  • ETP plant with accessories

This checklist was created by gopinathan

copy saved

copies saved