Bathroom Remodel in 7 Days

  • Day 1

  • Demo Preparation

    See description
  • #1Turn off water to home before starting Demo

    See description
  • #2 Remove Toilet

    See description
  • #3 Remove vanity top, disconnect plumbing, & remove old shut off valves

    See description
  • #4 Remove Vanity

    See description
  • #5 Cap water supplies

    See description
  • #6 Remove shower faucet trim

    See description
  • #7 Remove tub drain

    See description
  • #8 Cut and cap water supplies for faucet

    See description
  • #9 Remove Tub Surround

    See description
  • #10 Remove Tub

    See description
  • #11 Disconnect & remove light fixtures

    See description
  • #12 Remove all drywall or plaster

    See description
  • #13 Add temporary light fixture

    See description
  • #14 Remove Drywall Ceiling

    See description
  • #15 Remove existing vent fan

    See description
  • #16 Install new vent fan

    See description
  • #17 Run wire for recessed light above shower

    See description
  • #18 Hang Drywall ceiling

    See description
  • #19 Remove Floor

    See description
  • Day 2

  • #20 Remove existing trap

    See description
  • #21 Dryfit tub and Mark drain location

    See description
  • #22 Attach Fernco to existing plumbing

    See description
  • #23 Install new subfloor

    See description
  • #24 Install tub drain

    See description
  • Tubs I like and recommend

    See description
  • #25 Install tub drain assembly

    See description
  • #26 Dry fit tub and set ledger board

    See description
  • #27 Dry fit tub again 😊

    See description
  • #28 Set P-trap arm

    See description
  • #29 Set & secure tub in place

    See description
  • #30 Attach Trap to Drain assembly

    See description
  • #31 Adapt copper supplies to Pex

    See description
  • #32 Install rough-in shower valve

    See description
  • Tub/shower faucets I recommend

    See description
  • #33 Fill Tub and Test

    See description
  • #34 Move sink drain (if applicable)

    See description
  • #35 GFI outlet

    See description
  • Day 3

  • #36 Framing, blocking, shimming

    See description
  • #37 Blocking for Accessories

    See description
  • #38 Hanging Drywall

    See description
  • #39 1st coat drywall

    See description
  • #40 Tile Layout

    See description
  • #41 Frame niche

    See description
  • #42 Waterproof Backerboard for Tub Surround

    See description
  • #43 Valve & Pipe seals

    See description
  • Day 4

  • #44 Set Schluter Ditra for floor

    See description
  • #45 Waterproof against tub

    See description
  • #46 Waterproofing floor

    See description
  • #47 Tile Layout

    See description
  • #48 Determine trowel size

    See description
  • My favorite thinsets

    See description
  • #49 Check coverage

    See description
  • #50 Tile back wall of shower

    See description
  • #51 Cut shelving

    See description
  • #52 Tile side wall

    See description
  • Clean tiles

    See description
  • #53 2nd coat drywall

    See description
  • #54 Tile floor layout

    See description
  • #55 Cut and prepare floor tile

    See description
  • #56 Setting mosaics on Kerdi Band

    See description
  • Day 5

  • #57 Tile plumbing wall

    See description
  • #58 Tile Niche

    See description
  • #59 Set edging of Niche

    See description
  • #60 Set mosaic border

    See description
  • #61 Clean tile & tub

    See description
  • #62 Sand Drywall

    See description
  • #63 3rd coat drywall

    See description
  • #64 Set tile floor

    See description
  • #65 Cut door jambs for tile

    See description
  • #66 Set floor edging

    See description
  • Day 6

  • #67 Sand Drywall

    See description
  • #68 Touch-up drywall

    See description
  • #69 Clean up tile floor

    See description
  • #70 Mix Epoxy Grout

    See description
  • My favorite grouts

    See description
  • #71 Set grout

    See description
  • #72 Prep for paint

    See description
  • #73 Clean & tool grout

    See description
  • #74 Prime Walls & ceiling

    See description
  • #75 Caulk ceiling and edging joints

    See description
  • #76 Paint ceiling

    See description
  • #77 Shower trim

    See description
  • #78 Paint walls

    See description
  • #79 Caulk corners of tub surround

    See description
  • #80 Fill and caulk tub

    See description
  • #81 Grout floor

    See description
  • Day 7

  • #82 Replace Switches

    See description
  • #83 Install new GFI

    See description
  • #84 New breaker for GFI

    See description
  • #85 New Trap adapter for sink

    See description
  • #86 Install Vanity

    See description
  • #87 New shut-off valves

    See description
  • #88 Install sink faucet

    See description
  • #89 Set sink top

    See description
  • #90 Install base trim

    See description
  • #91 Connect Trap for sink

    See description
  • #92 Install heat vent and rest of base trim

    See description
  • #93 Install Light fixture

    See description
  • #94 Install Mirror

    See description
  • #95 Install toilet

    See description
  • #96 Accessories

    See description
  • #97 Shower rod

    See description
  • #98 Carpet Tuck

    See description
  • #99 Enjoy 😊

    See description
  • Join the course🎓

    See description
  • Buy me a coffee ☕

    See description
This checklist was created by bathroomremodelingteacher