QUALITY CONTROL CHECKLIST
-
PANEL CLEAN
-
PANEL STICKER UP TO DATE
-
BOOSTER // NAC PANELS STICKERED AND CLEAN
-
MONITORING STICKER FILLED OUT WITH CORRECT INFORMATION
-
ANNUNCIATOR STICKERS (IF APPLICABLE)
-
BATTERY STICKERS
-
BATTERIES TESTED?
-
BATTERIES UP TO DATE
-
LOG BOOK PRESENT AND FILLED OUT CORRECTLY
-
CLEANED LOG BOOK (2016+ REPORTS IS TO BE KEPT, 2015 REPORTS AND PRIOR IS TO BE THROWN AWAY)
-
OEM MANUALS PRESENT IN LOGBOOK
-
RECORD OF COMPLETION PRESENT IN LOG BOOK
-
AS-BUILTS PRESENT IN LOG BOOK
-
VERIFY MONTORING SIGNALS RECIEVED
-
VERIFY INSPECTION REPORTS
-
VERIFY DEVICE PART NUMBERS AND TYPES
-
TYPE OF PANEL AND DIALER LISTED IN EXCEL
-
DEVICE LOG COMPLETED (WITH PANEL AND DIALER LISTED)
-
-